New construction of a road salt facility for winter services in Munich

Romberger GmbH designed and manufactured the filling system for a road salt silo for winter services in Munich, including a feed hopper and conveyor technology.

  • Filling of a road salt silo with a capacity of 100 m³
  • Filling via a hopper using a wheel loader, then transported into the silo using screw conveyors and a belt bucket elevator
  • Conveying capacity: 40 t/h
  • Belt bucket elevator height: 15 m
  • Material construction: High-grade, salt-resistant stainless steel V4A